Skip to main content
Service · EV Charger Installation

Commercial EV Charger Installation

Level 2 and DC fast charger installation for parking structures, office buildings, retail properties, and multi-family housing.

Commercial EV charger installation by Constitution Electric
Scope of Work

What We Install

From single Level 2 stations to multi-port DC fast charging hubs, we install for office parking, multi-family, retail, hotels, fleet depots, and healthcare.

  • Level 2 (240V) stations: 4–8 hour charge, ideal for workplaces and apartments
  • DC Fast Chargers (DCFC): 20–40 minute charge for retail and public sites
  • Networked stations with payment processing
  • Load-managed installations sharing capacity across stations
  • Service and panel upgrades to support charger loads
  • Trenching, conduit, and bollard protection
  • ChargePoint, ABB, Tesla, Blink, EVgo equipment
  • Utility coordination and rebate paperwork
Our Process

How a Project Moves Through Our Shop

STEP 01

Site Assessment

We evaluate existing service capacity. Many buildings support Level 2 on existing panels.

STEP 02

Charger Selection

Right charger for your use case: workplace vs. public vs. fleet.

STEP 03

Design & Permitting

Layout, permits, and utility coordination if a service upgrade is needed.

STEP 04

Installation

Conduit, wiring, panels, disconnects, station mounting, and trenching.

STEP 05

Commissioning

Power on, verify rates, and connect to the management platform.

Benefits

Why It Matters for Your Building

Tenant & Customer Attraction

WA has one of the highest EV adoption rates in the country. Charging is now an expected amenity.

Future-Proof Infrastructure

We size conduit and panels for your next phase, ready before you need it.

Code & Incentive Capture

Many WA jurisdictions now require EV-ready parking. We document for PSE and SCL rebates.

FAQ

Common Questions

Ready to Get Started?

Call, email, or request a quote. We respond fast.

(425) 275-7554hello@constitutionelectricwa.com
Get a Quote